India, July 20 -- The Government of India has issued a release:

Sl.No.

Name of the Project

State/UT

Capacity

Target for Commissioning

1

Upper Sileru PSP (APGENCO)

Andhra Pradesh

1350

Feb'29

2

Sharavathy PSP (KPCL)

Karnataka

2000

May'32

3

Kundah PSP (Phase-I,II&III) (TANGEDCO)

Tamil Nadu

500

Feb'27

4

MP30GandhiSagarPSP(Greenko MP01 IREP Private Limited)

Madhya Pradesh

1920

Dec'26

5

Chitravathi PSP (Adani Renewable Energy Forty-Two Limited)

Andhra Pradesh

500

Feb'27

6

Bhivpuri PSP (Tata Power Company Limited)

Maharashtra

1000

Feb'29

7

Saundatti PSP(GreenkoKA01IREPPrivateLimited)

Karnataka

1600

Dec'27

8

BhavaliPSP(JSW Energy PSP Two Limited)

Maharashtra

1500

Dec'28

9

Gandikota PSP(Adani Renewable Energy Fifty-One Limited)

Andhra Pradesh

1000

Mar'29

10

Tarali PSP(Adani Renewable Energy One Limited)

Maharashtra

1500

Jun'29

11

Saidongar-1KarjatPSP

Maharashtra

3000

Dec'29

TOTAL

15,870

Sl.No.

Name of the project

State/UT

Capacity

Date of Concurrence/ Appraisal

1

ChichlikPSP*

Uttar Pradesh

1560

08.07.2026

2

Pane PSP

Maharashtra

1500

09.10.2025

3

Shirawta PSP (TataPower Company Ltd)

1800

01.09.2025

4

Kandhaura PSP

Uttar Pradesh

1680

13.06.2025

5

Upper Indravati PSP (Odisha Hydro Power Corporation Ltd.)

Odisha

600

19.08.2024

6

Turga PSP

West Bengal

1000

05.10.2016

TOTAL

8,140

(Executing Agency)

(MW)

(Torrent Energy Storage Solutions)

(Executing Agency)

(MW)

(Avaada Water Battery

(JSW Neo Energy Ltd)

Maharashtra

(JSWEnergyPSPSix Ltd)

(West Bengal State Electricity Distribution Company Ltd.)

Pvt.Ltd.)

Presently, 11 Pumped Storage Projects (PSPs) with an aggregate installed capacity of 15,870 MW are under construction Table- I. In addition, 6 PSPs with an aggregate installed capacity of 8,140 MW have been concurred/appraised by the Central Electricity Authority (CEA) and are yet to be taken up for construction Table-II.

The measures taken in respect of timely environmental and statutory clearances for Pumped Storage Projects (PSPs) include:

Pumped Storage Projects (PSPs) support the integration of renewable energy by storing surplus energy during off-peak periods and supplying power during peak demand. They provide long-duration energy storage, balancing power and ancillary grid services such as frequency regulation, voltage support and black start capability, thereby supporting grid stability, reliability and higher renewable energy penetration.

Central Government has taken a number of measures to encourage greater private sector participation in the development of PSPs as listed below:

TABLE-I

LIST OF UNDER CONTRUCTION PUMPED STORAGE PROJECTS

TABLE-II

LIST OF PSP SCONCURRED/APPRAISED BY CEA AND ARE YET TO BE TAKEN UP FOR CONSTRUCTION

*Appraised

This information was given by The Minister of State in the Ministry of Power, Shri Shripad Naik, in a written reply in the Rajya Sabha today.

Disclaimer: Curated by HT Syndication.