Sl.No.
Name of the Project
State/UT
Capacity
Target for Commissioning
1
Upper Sileru PSP (APGENCO)
Andhra Pradesh
1350
Feb'29
2
Sharavathy PSP (KPCL)
Karnataka
2000
May'32
3
Kundah PSP (Phase-I,II&III) (TANGEDCO)
Tamil Nadu
500
Feb'27
4
MP30GandhiSagarPSP(Greenko MP01 IREP Private Limited)
Madhya Pradesh
1920
Dec'26
5
Chitravathi PSP (Adani Renewable Energy Forty-Two Limited)
Andhra Pradesh
500
Feb'27
6
Bhivpuri PSP (Tata Power Company Limited)
Maharashtra
1000
Feb'29
7
Saundatti PSP(GreenkoKA01IREPPrivateLimited)
Karnataka
1600
Dec'27
8
BhavaliPSP(JSW Energy PSP Two Limited)
Maharashtra
1500
Dec'28
9
Gandikota PSP(Adani Renewable Energy Fifty-One Limited)
Andhra Pradesh
1000
Mar'29
10
Tarali PSP(Adani Renewable Energy One Limited)
Maharashtra
1500
Jun'29
11
Saidongar-1KarjatPSP
Maharashtra
3000
Dec'29
TOTAL
15,870
Sl.No.
Name of the project
State/UT
Capacity
Date of Concurrence/ Appraisal
1
ChichlikPSP*
Uttar Pradesh
1560
08.07.2026
2
Pane PSP
Maharashtra
1500
09.10.2025
3
Shirawta PSP (TataPower Company Ltd)
1800
01.09.2025
4
Kandhaura PSP
Uttar Pradesh
1680
13.06.2025
5
Upper Indravati PSP (Odisha Hydro Power Corporation Ltd.)
Odisha
600
19.08.2024
6
Turga PSP
West Bengal
1000
05.10.2016
TOTAL
8,140
(Executing Agency)
(MW)
(Torrent Energy Storage Solutions)
(Executing Agency)
(MW)
(Avaada Water Battery
(JSW Neo Energy Ltd)
Maharashtra
(JSWEnergyPSPSix Ltd)
(West Bengal State Electricity Distribution Company Ltd.)
Pvt.Ltd.)
Presently, 11 Pumped Storage Projects (PSPs) with an aggregate installed capacity of 15,870 MW are under construction Table- I. In addition, 6 PSPs with an aggregate installed capacity of 8,140 MW have been concurred/appraised by the Central Electricity Authority (CEA) and are yet to be taken up for construction Table-II.
The measures taken in respect of timely environmental and statutory clearances for Pumped Storage Projects (PSPs) include:
Pumped Storage Projects (PSPs) support the integration of renewable energy by storing surplus energy during off-peak periods and supplying power during peak demand. They provide long-duration energy storage, balancing power and ancillary grid services such as frequency regulation, voltage support and black start capability, thereby supporting grid stability, reliability and higher renewable energy penetration.
Central Government has taken a number of measures to encourage greater private sector participation in the development of PSPs as listed below:
TABLE-I
LIST OF UNDER CONTRUCTION PUMPED STORAGE PROJECTS
TABLE-II
LIST OF PSP SCONCURRED/APPRAISED BY CEA AND ARE YET TO BE TAKEN UP FOR CONSTRUCTION
*Appraised
This information was given by The Minister of State in the Ministry of Power, Shri Shripad Naik, in a written reply in the Rajya Sabha today.