MUMBAI, India, Nov. 23 -- Intellectual Property India has published a patent application (202641131429 A) filed by Dr. Lakhminaraynan. S; Harisubbu. N; Jarshan. E; Sarankumar. J; and Sivappriyan. M on November 03, 2026, for Delay Analysis Of Construction Project In Coimbatore.
Inventors include Dr. Lakhminaraynan. S; Harisubbu. N; Jarshan. E; Sarankumar. J; and Sivappriyan. M.
The application for the patent was published on November 20, 2026, under issue no. 47/2026.
Abstract: ABSTRACT OF THE INVENTION Construction delays are a major challenge in the construction industry, affecting project completion time, cost, quality, and overall performance. Delays can result in financial losses, inefficient resource utilisation, contractual disputes, and dissatisfaction among project stakeholders. Therefore, identifyinc2, the major causes of construction delays is essential for improving project management practices and ensuring timely project completion. This study focused on analysing the major causes of construction delays in Co imbatore, Tamil Nadu, and identifying practical measures to minimise their occurrence. A descriptive research design with a quantitative research approach was adopted. Primary data were collected through structured questionnaires distributed to construction professionals, including civil engineers, contractors, site engineers, consultants, and project managers. The questionnaire examined various factors contributing to construction delays, such as financial constraints, labour shortages, material supply delays, equipment failures, design changes, inadequate planning, poor site management, and communication gaps among project stakeholders. The collected data were analysed using frequency analysis, percentage analysis, the Likert scale, and the Relative Importance Index (Rh). These methods were used to evaluate the respondents' opinions, determine the relative importance of the identified factors, and establish their ranking based on the survey results. The analytical approach provided a systematic framework for understanding the major challenges affecting construction project progress in the study area. Based on the analysis, the study developed recommendations to improve construction project management and reduce delays. The proposed measures included effective project scheduling, timely procurement of construction materials, adequate financial planning, proper labour allocation, regular equipment maintenance, efficient site supervision, and improved communication and coordination among stakeholders. These measures can help construction professionals identify potential risks, minimise disruptions, and improve the utilisation of project resources. The study provides a foundation for understanding construction delay factors specific to Coimbatore and supports informed decision-making among construction professionals. The findings can contribute to improved planning, coordination, and resource management, ultimately promoting more efficient project execution and timely completion of construction projects.
Disclaimer: Curated by HT Syndication.